Just ordered, shipping time seems a little long

When I ordered mine somewhere around the start of November ( I believe? ) they pretty much immediately informed me about parts like the X-Controller, Probe and Clamps being on back order and supposedly shipping like 2 weeks later. The last part, the X-Controller, arrived during the first week of January so while they were pretty much upfront about parts arriving later the date it actually did was slightly amiss ;}

But hey… Waiting for it gave me enough time to learn more about Fusion 360 which probably occupied most of my mental resources in this new Project - Something I’d still highly recommend using.

Things I can recommend so far:

  • A 0.5mm shim between the ACME Delrin Nut and the Spindle Mount
  • Blue LockTite for any Screw without a Nylock Nut
  • A Fishscale to calibrate the Belt tension
  • Activate Soft Limit Switches ( $20=1 )
  • This Probing Macro by BillArnold

Things I already added to the X-Carve:

  • A DeWALT 611 Relay Box for those using a 230V System making use of the Side Board
    ( The Relay gets hooked to the PWM Terminal, not the 0-10V one )
  • A Tool Storage Plate also making use of the Side Board
  • The Y-Axis Stiffening and Side Cover MODs

Things I’m planning to add to it:

  • A Dust Shoe - Standing next to it with a Vacuum gets old REALLY fast
  • A Y-Axis Homing Switch Stopper on the right Rail to quickly align both sides if necessary

Things not to do:

  • Using a HSS Bit on MDF - It’ll ruin the Bit fast >_>
    ( Use Carbide ones instead )
1 Like