On the Maker M2, Easel files come in with very long “lead-in” paths. On the attached image, you can see that this table top would fit on my 4 x 8’ material but the lead-in (circled in yellow) is so long that it won’t fit. On other patterns I have to move the sled almost all the way off the material to make the cut.
How can I control this lead-in path? It seems unnecessary and limits what I can cut on the M2. Thanks for any ideas.