I have a very large project (42 x 80) and was setting up my tiling as I am going to have to do the carving on different days and over several days (project said over 50 hrs). I had gone through setting up my tiling (total of 8) for my first panel (21 x 80) and got down to the 6th tile to change it. Instead of changing the tiles below that I hadn’t checked yet, it changed the tiles I had already set (2-4). I had to go through and do this numerous times. Can we get it that it changes the tiles below and not the ones above?